For the design team, we had copy down the brand of equipments used in the membrane test kit so that we can do some research on it. Our design group has also asked Dr. Ziggy’s opinion regarding our current design (design is in the previous entry) and from his feedbacks we have to start again on our design.
Sunday, 31 May 2009
Sunday, 17 May 2009
First Phase
On 8 May 2009, I had met with the members from other team to discuss on the design of the multistage RO/NF system for this project. I was not sure what I was supposed to do at first as I did not attend the briefing held on 24 April 2009 (1st week). I knew that the design team has to design a 3 stage system with an ultimate aim to reduce the operating cost and the fixed capital through the modification of the conventional process.
Before this meeting, the design team leader had asked me to come up with my own design PFD with the necessary instruments in the design. While designing it, I missed out an important consideration in mind which is my design should be having different feed location because my group task is to find the optimum feed location using brackish water. On that day itself, I had to redesign my design. The design team, after much discussion, had come with the final design. We had shown Mr. Adrian and Ms. Ng the final design and they had given us their feedbacks. The feedback they give is that we should consider pressure required to the RO unit, putting the flow indicator on the low pressure side and they also shows us some configurations that we should have. There are quite a lot of amendments to be made. So the following day, the team had met up again to make changes with the design.
On 15 May 2009, the design team had presented the finalized design of the RO/NF system to Ms. Ng, one of the supervisors of the project, Dr. Adrian and Dr. Chong from NTU. They commented that our design was too complicated as the instruments/equipments were not tagged plus there were missing streams or streams that had no purpose. Hence, Ms. Claire had asked the team to focus on three configurations first before we add our own configurations as well in the design. So currently, the design team is focusing on these three configurations. Here is the current design:
Modelling (Wei Lu):
Our group was supposed to meet up on 6th May to discuss. However, due to some problems, we did not hold the meeting. Hence, we went home and tried on the case studies given to us.
The next meeting was on 15th May. Our modeling group presented on the calculations we did and due to the misleading configuration, we had to redo everything. We tried to use the new design from the design group and state assumptions. After which, we started to find the unknown values (for the recovery and rejections) using the assumptions made. We all tried out and are still trying out to get the values correct if possible.
Thursday, 14 May 2009
Initial Research
Week 1 & 2 of school (20 April 09 to 03 May 09)
During these 2 weeks, we had been exploring on membrane technology using the guide that Ms Yau had given us. Ms Yau helped us to kickstart our FYP research by providing us with guidance on what topics we should explore, as well as what to focus on at this point of time. Since we were going to purchase DOW membranes, we read up and attained a basic understanding of Reverse Osmosis (RO).
We started by learning methods of research by the SP's Student Advisory Service by the school library. The librarian taught us how to use the school's catalogue, as well as searching e-book databases that were extremely useful in our research. We managed to obtain a lot of information thereafter.
Although we were unable to borrow one of the books that Ms Yau had recommended to us (Membrane Technology and Applications and Membrane Technology and Applications) as they were not available,We were unable to research on other types of membrane processes in depth. Hence, we focused on reverse osmosis and nanofiltration membrane processes only.
Then, we had divided different tasks among our group members such that each member will focus on different topics and provide the information to the other members.
Farhana would be in the design team, collaborating with the supervisors and doctors from NTU to design out pilot plant. Cheryl will be in the membrane characterisation team, running tests on modules to get an idea on how would the RO and NF modules would react with varying parameters for each run. Weilu was assigned to the modelling team, which would make use of calculations and microsoft excel to give us the theoretical yield, purity and other parameters of the products.